Slide background





Preparation of As-Built Documentation for the Montenegrin part of the ± 500 kV HVDC SUBMARINE/UNDERGROUND Cable Phase I - Interconnection between Italy and Montenegro - Project MON.ITA

Client: PRYSMIAN POWERLINK S.r.l.- Foreign company branch
Name of partner(s): N/A
Start/Completion Date: October 2018 - March 2021
Project description: After SEEC has successfully finalized technical and main (detail) design services in 2016 necessary to obtain the Building Permit for the construction of the 500 kV HVDC submarine/underground cable of the Montenegrin part
Read more






EPS Metering Project Consultant for the Project Implementation Unit (PIU), Serbia

Client: EPS-Electric Power Industry of Serbia, Serbia
Name of partner(s): CESI, Italy - Main Contract holder
Start/Completion Date: January 2011 - June 2017
Project description: Assistance to EPS PIU in Project implementation. Main tasks and objectives of the Project:
Read more






Technical Services and Main Design for the Montenegrin part of the ± 500 kV HVDC SUBMARINE/UNDERGROUND Cable Interconnection between Italy and Montenegro - Project MONITA, Montengro

Client: Prysmian, Italy
Name of partner(s): N/A
Start/Completion Date: April 2013 – July 2016
Project description: MONITA project envisages supply and installation of ±500 kV HVDC
Read more






EPCG Metering Project Consultant for the Project Implementation Unit, Montenegro

Client: EPCG - Elektroprivreda Crne Gore AD -Nikši?, Montenegro
Name of partner(s): CESI, Italy – Main Contract holder
Start/Completion Date: May 2011 – December 2014
Project description: EBRD proposed EUR 35 million loan for funding the acquisition and installation of 175.000 meters throughout the Montenegrin distribution network, together with the related software, systems integration and ancillary
Read more






Lastva ? Pljevlja transmission Project? Preparation of Tender Documents, Montenegro

Client: CRNOGORSKI ELEKTROPRENOSNI SISTEM (CGES), Montenegro
Name of partner(s): N/A
Start/Completion Date: May 2012 - December 2012
Project description: The construction of a new 400/110/35 kV substation at Lastva on the Adriatic coast, the diversion and strengthening of the existing network around Lastva, and the construction of a new 155km long 400kV line from Lastva on
Read more






400/110/35 kV Substation Ribarevine and 110/10 kV Substation Podgorica 5, Montengro

Client: EPCG - Montenegrin Electric Enterprise AD – Nikši?, Montenegro
Name of partner(s): Fichtner GmbH, Germany - Main Contract holder
Start/Completion Date: June 2007- December 2011
Project description: To cope with the rising demand for electricity in Montenegro’s northeast region, it was necessary to convert Ribarevine 400 kV Substation into a 400/110/35 kV transformer substation and construct a new 110/10 kV
Read more






Technical Assistance (TA) to EMS Project Monitoring, Serbia

Client: EMS - Public Enterprise for electric energy transmission and transmission system control ''Elektromreža Srbije'' Serbian Transmission System and Market Operator
Name of partner(s): Fichtner GmbH, Germany - Main Contract holder
Start/Completion Date: September 2008 - September 2009
Project description: EMS required short-term technical assistance in relation to the final stage of an investment project for the rehabilitation of substations, as part of the modernizations and rehabilitation of the Serbian electricity transmission
Read more






Tender documentation preparation for procurement and installation of 110kV metal – enclosed gas – insulated switchgear for new 110/35/10 kV Kotor – Škaljari Substation, Montenegro

Client: EPCG - Montenegrin Electric Enterprise AD – Nikši?, Montenegro
Name of partner(s): N/A
Start/Completion Date: March 2008 – June 2008
Project description: The Client and the Beneficiary are the same company and it is Montenegrin Electric Enterprise – Nikši?. The aim of this project was to handle consulting services regarding tender documentation preparation for procurement
Read more






Integration of Baraha 400/132 kV Substation into DEWA 400 kV system, United Arab Emirates

Client: Fichtner GmbH, Germany
Name of partner(s): N/A
Start/Completion Date: July 2007 - September 2007
Project description: The scope of the consultancy services were mainly divided into two components namely feasibility studies and systems studies. The feasibility studies have analyzed all possible options, have been discussed with DEWA
Read more






Transmission System Expansion Phase VI, Qatar

Client: Fichtner GmbH, Germany (financed by Kahramaa Qatar Services, Qatar)
Name of partner(s): NA
Start/Completion Date: January 2006 - January 2007

Project description: SEEC experts covered the field of measurement and control equipment procurement procedures. The main tasks within the project were: tender preparation, clarification of tender, bid evaluation and contracting with suppliers.
Read more






Energy Sector Technical Assistance Project (ESTAP-II) – Feasibility Study for the Kosovo B (UNMIK)/Kashar (Albania) 400 kV Transmission Interconnection Project

Client: UNMIK Trust Agency Energy Division
Name of partner(s): CESI, Italy and Electroconsult, Italy
Start/Completion Date: March 2005 - October 2006
Project description: The overall objective of Task A was to prepare and submit a feasibility study report of the Kosovo–Albania 400 kV transmission line Project, able to meet economic power exchanges between KEK and KESH as well as the
Read more






Technical Assistance in the Preparation of the EIB funded Project for Transmission System Rehabilitation, Serbia

Client: EAR - European Agency for Reconstruction
Name of partner(s): N/A
Start/Completion Date: August 2003 - July 2005
Project description: The beneficiary of the project within EPS (Power Enterprise of Serbia) was Elektroistok - Transmission Company. SS Beograd 3 (220kV), Beograd 5 (220kV), Beograd 8 (400kV) and Novi Sad 3 (400kV) were proposed for
Read more







© Copyright S.E.E.C. Ltd. 2006-2025