Consulting Services During Elaboration of Technical Documentation for Construction of Petroleum Products Pipeline System through Serbia
Client: Transnafta, Serbia
Name of partner(s): N/A
Start/Completion Date: February 2010- July 2011
Project description: By introducing of petroleum products pipeline transportation (motor gasoline and diesel fuel) the remarkably higher reliability, economy, efficiency and continuity of supply is accomplished comparing to the other conventional types of transportation, especially regarding road transport which is predominant in Serbia. Environmental and accidental risks are thus being reduced to the minimum extent and by reducing the number of transhipments the losses will also be reduced. SEEC performed consulting services during the elaboration of the Feasibility Study with Preliminary Design as well as Environmental Impact assessment for the Petroleum Products Pipeline System from Pan?evo to Novi Sad and from Pan?evo to Smederevo.
Special attention has been given to analysis of transport external costs related to the environmental protection including GHG emissions